Brief Scope :

Dedicate the main SRCPP-Sur 48” pipeline for rich PDO gas from SNGP & SRCPP to feed rich gas consumers (e.g. Oman LNG & future SN-NGL plant), Dedicate the SNGP 48” loop line, and its new ~65 (approximate) km 48” pipeline to Oman LNG in Sur for lean gas (e.g. BP gas, NGLE residual gas) supplying non-LNG consumers (e.g. OMIFCO, Sur IPP, Al Kamil IPP, and SLIA). To Create gas quality/blending at GNH, where the two 48” pipeline meet and combine the lean & rich gas pipelines at new Sur GSS, and send the mix gas, using new launcher, to existing Oman LNG receiver.